Welcome to the company ! we have many years of professional experience !
systeelplate@outlook.com +86 13526880645

ASME SA-213/SA213M steel pipe

Henan Shang Yi Steel Trade Co., Ltd. is an enterprise specializing in steel sales and processing, cargo transportation and other services. It is committed to the production of wear-resistant steel plates, low-alloy high-strength plates, boiler vessel steel plates, composite steel plates, and extra-wide and extra-thick steel plates. Professional services such as bulk sales, warehousing, cutting and distribution. Products cover mining equipment, cement machinery, metallurgical machinery, construction equipment, ship equipment, power equipment, port equipment, transportation and general machinery manufacturing and other industries. The company's steel plate processing plant can cut semi-finished products and special-shaped parts according to user requirements, and can transport on behalf of customers. It is sold all over the country and exported overseas, and has won praise and trust from customers and markets.

Certificate of Honor

CONTACT US

Customer satisfaction is our first goal!

Phone

+86 13526880645

E-Mail

systeelplate@outlook.com

Address

No.186, Zi Dong Road, Guan Cheng District, Zheng Zhou, He Nan Province.

ASME SA-213/SA213M steel pipe
Shop door | Heavy Equipment Forums
Shop door | Heavy Equipment Forums

26/1/2013, · Dualie, while on the subject, I'll explain what I did and whats happening with my "frame", we built it out of 8 inch H beam, its 20 feet high, sitting on cemented in pillars and bolted to the top of the pillars, then another 8 inch H beam 40 feet long on top running north and south, the uprights sit in slightly from the ends of the 40 ,foot, beam, or about 4 feet from each end, we then put angle braces in going …

New and Used Ironworkers / Hole Punches
New and Used Ironworkers / Hole Punches

70 ton: Std. specs below-please verify USED METAL MUNCHER IRON WORKER MODEL MM70 A YEAR: 1998 Specifications: (at 65,000 PSI tensile) Punch Capacity: 70 ton (1” thru 7/8” mild ,steel,) Throat Depth: 9” Throat Height: 14” Punch Stroke: 0-7” Strokes ,per, minute: 40 at ½” Platen size: 11” x 48” Shear Capacity: 1” x 7”, ¾” x 12”, 3/8” x 20”, ¼” x 24” Standard Angle Capacity: 4” x 4” x 3/8” Standard Coping …

Building a Pier - Pond Boss Forum
Building a Pier - Pond Boss Forum

26/7/2008, · The posts were built from 3"x1"wall ,steel, pipe with a 1'x1'x 3/4" ,steel, plate welded to the bottom at a slight angle to match the slope. I then welded a 30"x 1" Pin (salvaged anchor bolts for concrete barrier) to the bottom. The main frame was constructed of ,4x4x1/4," angle iron welded.

How much does it weigh?
How much does it weigh?

23/2/2012, · Page 2 MARKET BULLETIN February 23, 2012 LOUISIANA DEPARTMENT OF AGRICULTURE & FORESTRY Market Bulletin, P.O. Box 91081, Baton Rouge, LA 70821-9081, (225) 922-1284 MARKET BULLETIN SUBSCRIPTION AND RENEWAL

Department of Enterprise Services
Department of Enterprise Services

A Frame (,4X4X1/4, Material) These are two (Both Sides) pieces of 3/4 inch thick X 4 inch angle iron that is approx. 28 and ½ inches in length. They are welded to the circle then to the moldboard mounting bar. 37 Inches from the ground to the forward top leading edge of the Moldboard

Building a Pier - Pond Boss Forum
Building a Pier - Pond Boss Forum

26/7/2008, · The posts were built from 3"x1"wall ,steel, pipe with a 1'x1'x 3/4" ,steel, plate welded to the bottom at a slight angle to match the slope. I then welded a 30"x 1" Pin (salvaged anchor bolts for concrete barrier) to the bottom. The main frame was constructed of ,4x4x1/4," angle iron welded.

Department of Enterprise Services
Department of Enterprise Services

A Frame (,4X4X1/4, Material) These are two (Both Sides) pieces of 3/4 inch thick X 4 inch angle iron that is approx. 28 and ½ inches in length. They are welded to the circle then to the moldboard mounting bar. 37 Inches from the ground to the forward top leading edge of the Moldboard

seanpistol's 01 Tundra | Toyota Tundra Forums
seanpistol's 01 Tundra | Toyota Tundra Forums

7/8/2015, · Over a ,foot, of fresh snow is my favorite wheeling. ... A few notches needed to be made in the ,4x4x1/4," angle iron to fit around a few obstacles, ... (so two pieces ,per, side of the 20.85" 1x2x3/16" ,tube, with a 30 degree angle at one end and 60 degree angle at the other).

Mfg Black Pdr
Mfg Black Pdr

Robb W. suggested arc welding a 4"X4"X1/4" thick plate to the jack piston in case you ever need to take the press apart. I suggest arc welding a large socket to the ,4x4x1/4, plate (large enough to accommodate the jack piston) in case you ever need to replace the jack :) -Steve K

seanpistol's 01 Tundra | Toyota Tundra Forums
seanpistol's 01 Tundra | Toyota Tundra Forums

7/8/2015, · Over a ,foot, of fresh snow is my favorite wheeling. ... A few notches needed to be made in the ,4x4x1/4," angle iron to fit around a few obstacles, ... (so two pieces ,per, side of the 20.85" 1x2x3/16" ,tube, with a 30 degree angle at one end and 60 degree angle at the other).

Jay Suggs (suggsjp) - Profile | Pinterest
Jay Suggs (suggsjp) - Profile | Pinterest

See what Jay Suggs (suggsjp) has discovered on ,Pinterest,, the world's biggest collection of ideas.

Civil Engineering Archive | June 30 2017 | Chegg.com
Civil Engineering Archive | June 30 2017 | Chegg.com

30/6/2017, · The 0.5-kg ball is fired from the ,tube, at A with a velocity of v = 7 m/s. The coefficient of restitution between the ball and the surface is e = 0.8. Suppose that a = 1.5 m. (Figure 1) Determine the

How much does it weigh?
How much does it weigh?

23/2/2012, · Page 2 MARKET BULLETIN February 23, 2012 LOUISIANA DEPARTMENT OF AGRICULTURE & FORESTRY Market Bulletin, P.O. Box 91081, Baton Rouge, LA 70821-9081, (225) 922-1284 MARKET BULLETIN SUBSCRIPTION AND RENEWAL

Shop door | Heavy Equipment Forums
Shop door | Heavy Equipment Forums

26/1/2013, · Dualie, while on the subject, I'll explain what I did and whats happening with my "frame", we built it out of 8 inch H beam, its 20 feet high, sitting on cemented in pillars and bolted to the top of the pillars, then another 8 inch H beam 40 feet long on top running north and south, the uprights sit in slightly from the ends of the 40 ,foot, beam, or about 4 feet from each end, we then put angle braces in going …

Mfg Black Pdr
Mfg Black Pdr

Robb W. suggested arc welding a 4"X4"X1/4" thick plate to the jack piston in case you ever need to take the press apart. I suggest arc welding a large socket to the ,4x4x1/4, plate (large enough to accommodate the jack piston) in case you ever need to replace the jack :) -Steve K

Building a Pier - Pond Boss Forum
Building a Pier - Pond Boss Forum

25/7/2008, · The main frame was constructed of ,4x4x1/4," angle iron welded. I drilled two holes approx. 12' out 3" and welded 3"id x 3 1/2" pipes over the holes. The 3"x3 1/2" short pipes had 2 1" holes in each which I welded 7/8" nuts to.

RV.Net Open Roads Forum: Truck Campers: Extension hitch ...
RV.Net Open Roads Forum: Truck Campers: Extension hitch ...

2/8/2011, · Your ,4x4x1/4 tube, bumper and hitch cross ,tube, is stout, perfect choice. I wouldn't change anything there. Use a 3x3x1/4 ,tube, (2-1/2" inside) as your hitch extension bar. Wrap the end of this ,tube, with 1 x 1/4 flat bar. No vertical support chains should be needed with this size ,tube,.

Inquiry Email

Business cooperation

+86 13526880645

Company address

No.186, Zi Dong Road, Guan Cheng District, Zheng Zhou, He Nan Province.